Wakapi
A critical auth bypass lands in the middle of Wakapi's slow identity rebuild.
A side-by-side editorial comparison of Harvest and OpenProject — release velocity, themes, recent moves, and the top alternatives to consider.
Harvest rebuilt its interface and split off a Premium tier for profitability
Harvest is mid-rollout of 'the new Harvest,' a full interface redesign paired with a paid Premium plan (profitability reporting, activity log, SAML SSO), task-level scheduling in Forecast, and reworked invoice sending. Its changelog reads as marketing-heavy blog posts and SEO articles rather than granular release notes, with several near-duplicate posts per release.
OpenProject settles into patch work after 17.7 shipped resource management.
17.7.0 was the substantial release — a resource management module with departments and work schedules, pushing OpenProject past task tracking into staffing. The two releases since are patches. 17.7.2 fixes four bugs, among them project-level hourly rates that could not be adjusted and non-working days silently dropped when saved while a reschedule job was running — both in the scheduling and cost areas 17.7 had just expanded.
Harvest is mid-rollout of 'the new Harvest,' a full interface redesign paired with a paid Premium plan (profitability reporting, activity log, SAML SSO), task-level scheduling in Forecast, and reworked invoice sending. Its changelog reads as marketing-heavy blog posts and SEO articles rather than granular release notes, with several near-duplicate posts per release.
The redesign is the surface; the deeper move is upmarket. Profitability insights, SSO, and a Premium tier target agencies and larger teams that need margin visibility, not just time entry. Harvest is repositioning from a timesheet tool toward a project-profitability system, with invoicing and Forecast scheduling as supporting pieces.
Expect the new interface to finish rolling out to all accounts and more Premium-only reporting to follow the Profitability tier.
17.7.0 was the substantial release — a resource management module with departments and work schedules, pushing OpenProject past task tracking into staffing. The two releases since are patches. 17.7.2 fixes four bugs, among them project-level hourly rates that could not be adjusted and non-working days silently dropped when saved while a reschedule job was running — both in the scheduling and cost areas 17.7 had just expanded.
The release rhythm is a feature minor followed by a short tail of patches repairing the surface it just added, and this tail sits squarely in resource-management territory. Rate and non-working-day bugs are the predictable cost of shipping scheduling and cost tracking together. For self-hosted operators the advice does not change between these releases: take the patch.
Expect one or two more 17.7.x patches against the resource management surface before 17.8 opens a new feature line.
Other PM products tracked by Sparkpulse, ranked by recent ship velocity. Each card links to a full editorial trajectory and lets you pivot into a head-to-head comparison with either Harvest or OpenProject.
A critical auth bypass lands in the middle of Wakapi's slow identity rebuild.
Process Street's public feed is an SEO content engine, not a changelog.
NocoBase runs two release lines at once while the v3 client rewrite absorbs the AI work
Hive ships in batches, and this one is all planning accuracy and admin control.
Plane ships a fortnightly digest, and the AI layer is where the real work is going.
Ever Teams shipped ten tags in twelve hours and one of them touched the product
See all Harvest alternatives → · See all OpenProject alternatives →
Latest ship moves from both products, interleaved chronologically. ⚡ = editorial spark.
They serve adjacent needs but don't currently overlap on shipped themes. OpenProject is currently shipping more aggressively (velocity 6.3 vs 2.5), with 1 editorial sparks in the last 30 days against 0. See the at-a-glance table above for a side-by-side breakdown of velocity, recent sparks, and editorial themes.
Sparkpulse doesn't pick a winner — we score release velocity, not feature parity. OpenProject is currently shipping more aggressively (velocity 6.3 vs 2.5), with 1 editorial sparks in the last 30 days against 0. For your specific use case, the alternatives sections above list other PM products to evaluate alongside.
Top Harvest alternatives in PM are ranked by recent ship velocity. Browse the "Harvest alternatives" section above for the current picks, or visit /alternatives/harvest for the full list with editorial commentary on each.
Top OpenProject alternatives in PM are ranked by recent ship velocity. Browse the "OpenProject alternatives" section above for the current picks, or visit /alternatives/openproject for the full list with editorial commentary on each.