← Back to home
Comparison · HR

Ever Gauzy vs Horilla

A side-by-side editorial comparison of Ever Gauzy and Horilla — release velocity, themes, recent moves, and the top alternatives to consider.

Ever Gauzy vs Horilla: at a glance

FeatureEver GauzyHorilla
SectorHRHR
Velocity score7.55.0
Sparks · 30d00
Top themeshr-platform, project-management, plane-integration, privacysecurity, access-control, open-source, hr-software
Last editorial update16h ago28d ago
WebsiteVisit →Visit →

What is Ever Gauzy?

Ever Gauzy follows account deletion with nine same-day patches carrying project archiving.

Ever Gauzy shipped 111.142.0 on October 28 with self-serve account deletion and telemetry redaction, then cut nine patch tags the same day. The substantive ones carry archive and unarchive for projects and teams, per-task sync scope that keeps tasks private to the platform, a redesigned project dashboard and proposal details, and email links restricted to allowed origins. The rest are egress-audit baselines and Plane plugin bumps adding status-less projects and employee subscriptions.

Read the full Ever Gauzy trajectory →

What is Horilla?

Horilla shipped six security releases in three weeks, ending with a no-login RCE.

Horilla's 2.1.x line has become a running security audit. Between 2.1.1 and 2.1.8 the team closed more than a dozen externally reported advisories, from stored XSS and local file reads to salary-redirect and self-approval flaws, capped by an unauthenticated remote code execution in the public recruitment flow.

Read the full Horilla trajectory →

Ever Gauzy vs Horilla: editorial side-by-side

E7.5

Ever Gauzy follows account deletion with nine same-day patches carrying project archiving.

◆ Current state

Ever Gauzy shipped 111.142.0 on October 28 with self-serve account deletion and telemetry redaction, then cut nine patch tags the same day. The substantive ones carry archive and unarchive for projects and teams, per-task sync scope that keeps tasks private to the platform, a redesigned project dashboard and proposal details, and email links restricted to allowed origins. The rest are egress-audit baselines and Plane plugin bumps adding status-less projects and employee subscriptions.

◆ Where it's heading

The product is shipping in waves: a large stage merge, then a string of small tags that move it to production. Two threads run through October: tidying the project and task model (archiving, sync scope, a Plane integration) and privacy and compliance work (account deletion, egress audits, DPIA links).

◆ Prediction

Expect more Plane plugin bumps and UI redesigns from the same contributors, plus further egress-audit and compliance tags as account deletion settles in production.

H5.0

Horilla shipped six security releases in three weeks, ending with a no-login RCE.

◆ Current state

Horilla's 2.1.x line has become a running security audit. Between 2.1.1 and 2.1.8 the team closed more than a dozen externally reported advisories, from stored XSS and local file reads to salary-redirect and self-approval flaws, capped by an unauthenticated remote code execution in the public recruitment flow.

◆ Where it's heading

The pattern is consistent: outside researchers are probing the 2.x codebase, and the maintainers are responding fast with detailed advisories and no-migration patches. Most of the flaws are authorization checks that trusted any manager relationship rather than the specific record, which points to a codebase-wide access-control review rather than one-off fixes.

◆ Prediction

Expect more point releases closing authorization bugs in the remaining HR modules (payroll, attendance, assets) before any feature work resumes on 2.2.

Alternatives to Ever Gauzy and Horilla

Other HR products tracked by Sparkpulse, ranked by recent ship velocity. Each card links to a full editorial trajectory and lets you pivot into a head-to-head comparison with either Ever Gauzy or Horilla.

See all Ever Gauzy alternatives → · See all Horilla alternatives →

Recent activity from Ever Gauzy and Horilla

Latest ship moves from both products, interleaved chronologically. ⚡ = editorial spark.

  1. 19h agoEver Gauzy111.142.9: Plane plugin 0.1.14 names org on unsubscribe
  2. 22h agoEver Gauzy111.142.8: Plane sync handles status-less projects
  3. 1d agoEver Gauzy111.142.7: egress-audit flag reset
  4. 1d agoEver Gauzy111.142.6: proposal details redesign
  5. 1d agoEver Gauzy111.142.5: Wave 23 CI fixes and OpenRouter save
  6. 1d agoEver Gauzy111.142.4: project archiving, task sync scope, dashboard redesign
  7. 1mo agoHorilla2.1.8 — Security release
  8. 1mo agoHorilla2.1.5 — Bug-fix release
  9. 1mo agoHorilla2.1.4 — Security release
  10. 1mo agoHorilla2.1.3 — Security and bug-fix release
  11. 1mo agoHorilla2.1.2 — Security patch
  12. 1mo agoHorilla2.1.1 — Security patch

Frequently asked questions

What is the difference between Ever Gauzy and Horilla?

They serve adjacent needs but don't currently overlap on shipped themes. Ever Gauzy is currently shipping more aggressively (velocity 7.5 vs 5.0), with 0 editorial sparks in the last 30 days against 0. See the at-a-glance table above for a side-by-side breakdown of velocity, recent sparks, and editorial themes.

Is Ever Gauzy better than Horilla?

Sparkpulse doesn't pick a winner — we score release velocity, not feature parity. Ever Gauzy is currently shipping more aggressively (velocity 7.5 vs 5.0), with 0 editorial sparks in the last 30 days against 0. For your specific use case, the alternatives sections above list other HR products to evaluate alongside.

What are the best alternatives to Ever Gauzy?

Top Ever Gauzy alternatives in HR are ranked by recent ship velocity. Browse the "Ever Gauzy alternatives" section above for the current picks, or visit /alternatives/ever-gauzy for the full list with editorial commentary on each.

What are the best alternatives to Horilla?

Top Horilla alternatives in HR are ranked by recent ship velocity. Browse the "Horilla alternatives" section above for the current picks, or visit /alternatives/horilla for the full list with editorial commentary on each.